| |
Fairview Container Specifications
|
|
| |
PHASE 2 Expansion Plan
Total Area: 32 Hectares (80 Acres)
|
|
| |
Capacity: 1.5 million TEUs
|
|
| |
Cranes: 6-8 Super Post Panamax
|
TO VIEW A VIDEO DESCRIBING PRINCE RUPERT’S STRATEGIC ADVANTAGES, CLICK HERE
Further information:
Can be requested from the Prince Rupert Port Authority through mail, phone, fax or e-mail:
Mailing Address:
Prince Rupert Port Authority
200-215 Cow Bay Road
Prince Rupert, BC
V8J 1A2
Phone: 250-627-8899 Fax: 250-627-8980 E-mail:pcorp@rupertport.com
|
|
The Prince Rupert Container Terminal Development - Phase 2
The vision of the future includes the expansion of the Prince Rupert Container Terminal to quadruple the capacity of the facility to 2 million TEUs by 2012. The project will extend the wharf to 800 metres, achieve an 18 metre (59 feet) minimum water depth, increase the dock area to 56 hectares (139 acres), and quadruple to eight the number of post-panamax cranes. The expanded facility will have an on-site storage capacity of 28,560 TEUs at five high.
Phase 2 engineering design, environmental assessment and consultation are well underway. Construction is expected to commence in early 2009 and completed by 2013.
| Total Area: |
32 Hectares (80 Acres) |
| Design Capacity: |
1.5 million TEUs |
| Length: |
>440 metres (1443 feet) |
| Berths: |
1 |
| Water Depth: |
>18 metres (59 feet) |
| Container Yard: |
18,560 TEUs; 144 reefer plugs |
| Intermodal Yard: |
9,144 metres (30,000 feet) of trackage; 400 TEU capacity |
| Rail Services: |
7 working tracks; 6 storage tracks; 7,900 metres (25,900 feet) train capacity serviced directly by CN intercontinental railway |
| Equipment: |
- 6-8 ultra post-panamax cranes |
| |
- 144 reefer plugs at 480V/60AMP |
| |
- 4 radiation portals |
| |